江行全教授 (元智學術講座)的研究著作與獎項等資料如下:
 

A.    期刊論文
1.    Yang, W. H.;Jiang, B. C., An integrated statistical process control and wavelet transformation model for detecting QRS complexes in ECG signals, International Journal of Artificial Life Research, 1,pp.1-20, 201004

2.    Jiang, B. C.,Wang, C. C.;Chen, H. J.;Chu, C. C., Automatic Bubble Defect Inspection for Microwave Communication Substrates Using Multi-threshold Technique Based Co-Occurrence Matrix, International Journal of Production Research, 48,pp.2261-2371, 201004

3.    Bernard C. Jiang;Wang, C. C.;Lu, J.;Jen, C. H.;Shu-Kai S. Fan,Using Simulation Techniques to Determine Optimal Operational Region for Multi-Responses Problems,International Journal of Production Research,47,pp.3219-3230,200909

4.    Hung, C. H.;Jiang, B. C., Multi-scale Entropy Approach to Physiological Fatigue during Long-term Web Browsing, Human Factors and Ergonomics in Manufacturing, 19,pp.478-493, 200910

5.    Wang, C. C.;Jiang, B. C.,Jen, C. H.;Wu, M. Y., Evaluation of Fuzzy Neural Network Run-to-Run Controller Using Numerical Simulation Analysis for SISO Process, Expert System with Applications, 36,pp.12044-12048, 200912

6.    Bernard C. Jiang;Wang, C. C.;Huang, W. H.,Evaluation of a Digital Camera Image Applied to PCB Inspection,International Journal of Human Factors and Ergonomics in Manufacturing,18,200808

7.    Jiang, B. C, Wang, C. C.;Hsu,Y. N.,Machine vision and background remover based approach for PCB solder joints inspection,International Journal of Production Research,(期別:45,pp.451-464),February,2007

8.    Jiang, B. C., Wang, C. C, and Hau, Y. N. (2006) "Machine vision and background remover based approach for PCB solder joints inspection," International Journal of Production Research, (Accepted), (SCI).

9.    江行全,蔡篤銘,王建智(2006) "應用機器視覺於液晶螢幕面板表面瑕疵檢測",機械月刊,Vol.32, pp.78-87.

10.    Jiang, B. C., Wang, C. C, Liu, H. C (2005) "LCD Surface Uniformity Defect Inspection Using ANOVA and EWMA Techniques," International Journal of Production Research, Vol. 43, No. 1, pp. 67-80(SCI).

11.    Wang, C. C and Jiang, B.C. (2005) "Integral DOE and MANOVA Technique for Classification Feature Selection: Using Solder Joint Defects as an Example," International Journal of Advanced Manufacturing Technology, Vol.27, No.3-4, pp.392-396. (SCI)

12.    Jiang, B. C., Wang, C. C., and Chen, P. L (2004) "Logistic Regression Tree Applied to Classify PCB Golden Finger Defects," International Journal of Advanced Manufacturing Technology, Vol 24, No.7, pp. 496-502 (SCI).

13.    Wang. C. C and B. C. Jiang (2004) "Integral DOE and MANOVA Techniques for Classification Feature Selection: Using Solder Joint Defects as an Example," International Journal of Advanced Manufacturing Technology, (Accepted and Published online with DOI : 10.1007/s00170-004-2186-4), (SCI).

14.    Jen, C. H., B. C. Jiang and S. K. Fan (2004) "General Run-to-Run (R2R) Control Framework Using Self-Tuning Control for Multiple-Input Multiple-Output (MIMO) Processes," International Journal of Production Research, Vol. 42, No. 20, pp. 4249-4270 (SCI).

15.    Jaing, B. C., Wang, C. C., Liao, K. D and Lee, S. H (2004) "Study of Dynamic X-Ray Image Enhancement and Defects Classification," Journal of the Chinese Institute of Industrial Engineering, Vol.21, No.4, pp. 409-421(EI).

16.    Wang, C. C and B. C. Jiang (2004) "Design Feature Selection Index based on Overlap Region Applied to PCB Defects Classification," Images and Recognition , Vol. 10, No.2, pp. 40-51.

17.    Wang. C. C., B. C. Jiang , and Liu, C. W and Chen, P. L (2004) "The Research of PCB Impedance Model – A Case Study of Eight-Layer Board," Journal of Quality , Vol. 11, No.2, pp. 85-92.

18.    Jiang, B. C and T. J. Hsueh (2003) “Develop a Methodology for Evaluating a Hybrid 3D Noncontact Measurement System Capability”, Journal of the Chinese Institute of Industrial Engineering ,Vol.20, No.5, pp. 465-471, (EI).

19.    Jiang, B. C and C. H. Hsu (2003), “Development of a fuzzy decision model for manufacturability evaluation”, Journal of Intelligent Manufacturing, Vol. 14, No.2, pp. 169-181, (SCI) (Impact factor:0.610)

20.    江行全,(2003) “6σ之核心精神--4P”,品質月刊,Vol. 60, pp. 60-61.

21.    Jiang, B. C ., Tasi, S. L. and Wang, C. C (2002) "Machine-Vision Based Grey Relational Theory Applied to IC Marking Inspection," IEEE Transactions on Semiconductor Manufacturing ,Vol. 15, No. 4, pp. 531-539,(SCI). (Impact factor:1.031)

22.    Jiang, B. C and J. Lan, (2002)”Group Technology Application for PCB Assembly,” International Journal of Industrial Engineering, Vol. 9, No. 4, pp. 399-407(SCI). (Impact factor:0.077)

23.    Jiang, B. C and S. D. Chiu (2002) “Form tolerance-based measurement points determination with CMM,” Journal of Intelligent Manufacturing, Vol. 13, No. 2, pp. 101-108, (SCI) (Impact factor:0.551)

24.    Fan, S. k., Jiang, B. C., Jen, C. H., and Wang, C. C (2002) "SISO Run-to-Run Feedback Controller using Triple EWMA Smoothing for Semiconductor Manufacturing Processes," International Journal of Production Research ,Vol. 40, No. 13, pp. 3093-3120, (SCI). (Impact factor:0.600)

25.    Wang, C. C, Jiang, B. C and Lee, S. X (2002) "Applied SPC, DOE and RSM Techniques to Reduce the Defects of Aluminum Felly - A Case Study of Die Casting Process," Journal of Quality, Vol. 9, No. 2, pp. 1-17.

26.    江行全,陳啟光 (2002) “建構顧客導向服務文化的觀念與作法”,研考雙月刊Vol. 26, pp. 93-101.

27.    Jiang, B. C, Wang, Y. M and Wang, C. C (2001) "Bootstrap Sampling Techniques Applied to PCB Golden Fingers Defect Classification Study," International Journal of Production Research, Vol. 39, No. 10, pp. 2215-2230, (SCI). (Impact factor:0.438)

28.    Jiang, B. C and T. C. Chen (2001) “Machine vision inspection for the protrusion rate of a diamond tool,” Journal of Manufacturing Systems, Vol. 20, No. 5, pp. 357-362, (SCI). (Impact factor:0.324)

29.    Jiang, B. C, Yu, C. L. and Wang, C. C. (2001) "The Evaluation of Artwork Dimensional Variance for PCB Manufacturing Process," Journal of Quality Vol. 8, No. 1, pp.85-105 [90年度最佳品質論文獎].

30.    Wang, C. C, and B. C. Jiang (2001) "PCB Solder Joints Defects Detection and Classification Using Machine Vision," International Journal of Industrial Engineering. Vol. 8, No.4, pp. 359-368, (SCI). (Impact factor:0.108)

31.    張榮森、蔣東儒、江行全、林漢傑 (2001) “光學研磨操控參數之多目標優化--誤差調合實驗與類神精網路的應用”, 泰山職訓學報, Vol. 4, pp. 236-261.

32.    Tseng, Y. J. and B. C. Jiang (2000) “Evaluating Multiple Feature-Based Machining Methods Using an Activity-Based Cost Analysis Model,” International Journal of Advanced Manufacturing Technology,” Vol. 16, No. 9, pp.617-623, (SCI) (Impact factor:0.374)

33.    張榮森、蔣東儒、江行全、林漢傑 (2000) “光學研磨機械運動參數最佳化 – 田口方法”, 泰山職訓學報, 第三期, pp. 124-138.

34.    Hsu, C. H. and B. C. Jiang (1999) “Fuzzy Multiple Attribute Decision Making Using a Simplified Centroid-based Arithmetic Process,” International Journal of Industrial Engineers, Vol. 6, No. 1, pp. 61-71, 1999, (SCI) (Impact factor0.158)

35.    江行全、陳怡和 (1999) “供應商管理標竿之建立與分析-以台灣筆記型電腦產業為例”,品質學報,Vol. 6, No. 1, pp. 157-182.

36.    Hsu, C. H., B. C. Jiang and E. S. Lee (1999) “Fuzzy Neural Network Modeling for Product Development,” International Journal of Mathematical and Computer Modelling, Vol 29, pp. 71-81, (SCI) (Impact factor:0.303)

37.    Shiau, Y. and B. C. Jiang (1999) “Study of a Measurement Algorithm and the Measurement Loss in Machine Vision Metrology,” Journal of Manufacturing Systems, Vol. 18, No. 1, pp. 22-34, (SCI) (Impact factor:0.507)

38.    Chou, C. Y., B. C. Jiang, and J. C. Chen (1999) “A Study on the Process Capability Index Cp for Correlated Data,” Proceedings of the National Science Council, ROC, Part A: Physical Sciences and Engineering, Vol. 23, No. 2, pp. 319-329.

39.    Jiang, B. C., Lin, T. T. and Wang, C. C. (1999) "A Study of Using Machine Vision System for Surface Defects Classification," Journal of the Chinese Institute of Industrial Engineering Vol. 16, No. 4, pp. pp. 443-453,(EI).

40.    Chou, C. Y., P. H. Wang and B. C. Jiang (1999) “A Comparative Study on the Estimators of Standard Deviation in Statistical Process Control,” Journal of the Chinese Institute of Engineers, Vol. 22, No. 1, pp. 109-116.(SCI) (Impact factor:0.084)

41.    Wang, C. C, and B. C. Jiang (1998) "An Application of Logistic Regression Method for Semiconductor Process Analysis," Journal of Quality, Vol. 5, pp. 91-105.

42.    江行全、黃家弘、鄭元杰、王台平 (1998) “網際網路上利用模糊決策模式建構易製性評估系統”,科技管理學刊,Vol. 3, No. 2, pp. 155-175.

43.    陳世賢、蕭堯仁、江行全 (1998) “可攜式機器視覺軟體系統架構之發展與建立”,中國工業工程學刊,Vol. 15, No. 6, pp. 559-571.

44.    Jiang, B. C. and S. J. Jiang (1998) “Machine Vision Based Inspection of Oil Seals,” Journal of Manufacturing Systems, Vol. 17, No. 3, pp. 159-166.(SCI)

45.    徐正聲、江行全 (1998) ”光源模擬系統:應用於機器視覺系統中光源最佳位置之決定”,中國工業工程學刊, Vol. 15, No. 1, pp. 69-82.

46.    江行全、郭錦茂、許績興 (1997) “以作業為基成本法對工件易製性之研究”,管理與系統,第三卷,第二期,pp. 233-263.

47.    Chou, C. Y., B. C. Jiang, and Y. R. Shiau (1997) “Implementing the Automated Visual Inspection in Quality Control System,” Journal of Industrial Technology, Vol. 14, No. 1, pp. 6-11, 1997.(SCI)

48.    Jiang, B. C., R. Duraisamy, G. Wiens and J T. Black (1997) “Robot Metrology Using Two Kinds of Measurement Equipment,” Journal of Intelligent Manufacturing, Vol. 8, No. 2, pp. 137-146. (SCI)

49.    陳雲岫、張永弢、江行全 “利用統計模型對物件表面缺陷之分類研究—油封為例”,中國工業工程學刊,Vol. 13, No. 3, pp.283-294, 1996.

50.    葉若春,江行全 “實施教學品保制度經驗談”,品質月刊,Vol. 32,pp. 24-26,1996.

51.    江行全 “流程改造” ,品質月刊,Vol. 31,pp. 27-29,1995.

52.    Cheng, O. S. and B. C. Jiang, “A Study of Voice Controlled Robot Under Noisy Background,” Journal of Yun-Lin Institute of Technology, Vol. 4, pp. 105-115, 1995.

53.    Cheng, O. S. and B. C Jiang “An Integrated Safety and Manufacturing System,” International Journal of Human Factors in Manufacturing, Vol. 5, No. 3, pp. 303-324, 1995. (SCI)

54.    Shiau, Y. R. and B. C. Jiang, “A Methodology to Evaluate/Improve the Performance of a Machine Vision System,” International Journal of Production Research, Vol. 31, No. 6, pp. 1467-1478, 1993. (SCI)

55.    Wu, C. M., B. C. Jiang and C. H. Wu, “Using Neural Networks for Robot Positioning Control,” Robotics & Computer Integrated Manufacturing, Vol. 1, No. 3, pp. 153-168, 1993. (SCI)

56.    Wu, C. M., B. C. Jiang and Y. R. Shiau, “Controlling a Robot’s Position Using Neural Networks,” International Journal of Advanced Manufacturing Technology, Vol. 8, pp. 216-226, 1993. (SCI)

57.    Chen, C. C., B. C. Jiang and C. H. Wu, “Learning Optimization for CPN-Based Training in Robot Positioning Control,” Journal of Intelligent Manufacturing, Vol. 3, pp. 237-250, 1992. (SCI)

58.    Buchanan, T. L., K. N. Barker, J. T. Gibson, B. C. Jiang, and R. E. Pearson, “Illumination and Errors in Dispensing,” American Journal of Hospital Pharmacy, Vol. 48, pp. 2137-2145, 1991. (SCI)

59.    Jiang, B. C., D. W. H. Chen, J T. Black and J. N. Hool, “Taguchi-based Methodology in Determining/Optimizing Robot Process Capability,” IIE Transactions, Vol. 23, No. 2, pp. 169-184, 1991. (SCI)

60.    Shiau, Y. R. and B. C. Jiang, “Determine a Vision System’s 3D Coordinate Measurement Capability Using Taguchi Methods,” International Journal of Production Research, Vol. 29, pp. 1101-1122, 1991. (SCI)

61.    Chen, W. and B. C. Jiang, “3-D Camera Calibration Using Vanishing Point Concept,” Pattern Recognition, Vol. 24, No. 1, pp. 57-67, 1991. (SCI)

62.    Wu, C. M., J T. Black and B. C. Jiang, “Using Taguchi Methods to Determine/Optimize Robot Process Capability for Path Following,” Robotics and Computer Integrated Manufacturing, Vol. 8, No. 1, pp. 9-25, 1991. (SCI)

63.    Jiang, B. C., A. Y. H. Liou, N. Suresh, and O. S. H. Cheng, “An Evaluation of Machine Guarding Techniques for Robot Guarding,” Robotics, Vol. 7, No. 4, pp. 299-308, 1991. (SCI)

64.    Jiang, B. C., J. C. L. Chang, J T. Black, and L. Kutz, “Determine/Optimize An Industrial Robot’s Process Capability Using Taguchi Methods,” Transactions of the North American Manufacturing Research Institute of SME 1990, pp. 266-272, also as SME technical paper MS90-239.

65.    Black, J T. and B. C. Jiang, “Robot Process Capability Study Using Taguchi Methods,” Manufacturing Review, Vol. 3, No. 2, pp. 106-114, 1990. (SCI)

66.    Jiang, B. C., “Development of a Machine Vision System for Education,” Computers in Industrial Engineering, Vol. 18, No. 1, pp. 23-28, 1990. (SCI)

67.    Jiang. B. C. and R. Y. Shiau, “A Systematic Methodology for Determining/Optimizing a Machine Vision System’s Capability,” Machine Vision and Applications, Vol. 3, pp. 169-182, 1990. (SCI)

68.    Jiang, B. C. and O. S. H. Cheng, “Design for Robotic Cell Safety,” Journal of Manufacturing Systems, Vol. 9, No. 2, pp. 169-175, 1990. (SCI)

69.    Jiang, B. C. and O. S. H. Cheng, “A Procedure Analysis for Robot System Safety,” International Journal of Industrial Ergonomics, Vol. 6, pp. 95-117, 1990. (SCI)

70.    Jiang, B. C., J T. Black, J. N. Hool, and C. M. Wu, “Determining Robot Process Capability Using Taguchi Methods,” Journal of Robotics and Computer-Integrated Manufacturing, Vol. 6, No. 1, pp. 55-66, 1989. (SCI)

71.    Jiang, B. C., J T. Black, and R. Duraisamy, “A Review of Recent Developments in Robot Metrology,” Journal of Manufacturing Systems, Vol. 7, No. 4, pp. 339-357, 1988. (SCI)

72.    Aghazadeh, F. and B. C. Jiang, “Some Considerations in the Use of Isometric, Isoinertial and Isokinetic Strength Models for Predicting Lifting Capacity,” International Journal of Industrial Ergonomics, 2, pp. 101-110, 1988. (SCI)

73.    McCoy, M. A., J. J. Congleton, W. L. Johnston and B. C. Jiang, “The Role of Lifting Belts in Manual Lifting,” International Journal of Industrial Ergonomics, Vol. 2, pp. 259-266, 1988. (SCI)

74.    Jiang, B. C. and C. M. Wu, “A Biomechanical Modeling of the Body Weight Effects on a Manual Lifting Task,” International Journal of Production Research, Vol. 26, No. 2, pp. 219-235, 1988. (SCI)

75.    Jiang, B. C. and J T. Black, “Improving and Measuring Robot Process Capability,” CIM Review, Summer 1987, pp. 44-49, also in Handbook of Manufacturing Automation and Integration, Ed. J. Stark, Published by Auerbach Publishers, pp. 769-776.

76.    Jiang, B. C. and C. A. Gainer, “A Cause-and-Effect Analysis of Robot Accidents,” Journal of Occupational Accidents, Vol. 9, pp. 27-45, 1987(SCI)

77.    Jiang, B. C. and M. M. Ayoub, “Modeling of Maximum Acceptable Load of Lifting by Physical Factors,” Ergonomics, Vol. 30, No. 3, pp. 529-538, 1987. (SCI)

78.    Ayoub, M. M., B. C. Jiang, J. L. Smith, J. L. Selan and J. W. McDaniel, “Establishing Physical Criteria for Assigning Personnel to Air Force Jobs,” American Industrial Hygiene Association Journal, Vol. 48, No. 5, pp. 464-470, 1987. (SCI)

79.    Jiang, B. C. and A. Mital, “A Procedure for Redesigning/Evaluating of Manual Meterials Handling Tasks,” International Journal of Production Research, Vol. 24, No. 4, pp. 913-925, 1986. (SCI)

80.    Jiang, B. C., J. L. Smith and M. M. Ayoub, “Psychophysical Modeling for Combined Manual Materials Handling Activities,” Ergonomics, Vol. 29, No. 10, pp. 1173-1190, 1986. (SCI)

81.    Jiang, B. C., J. L. Smith, and M. M. Ayoub, “Psychophysical Modeling of Manual Materials Handling Capacities Using Isoinertial Strength Variables,” Human Factors, Vol. 28, No. 6, pp. 691-702, December 1986. (SCI)

82.    Smith, J. L. and B. C. Jiang, “A Manual Handling Study of Bag Lifting,” American Industrial Hygiene Association Journal, 45(8), pp. 505-508, August 1984. (SCI)


B.    會議論文
1.    Hung, C. H.;Jiang, B. C., 應用多尺度熵方法於評估長時間網頁瀏覽活動, 第17屆人因工程學會年會暨學術研討會, 201005

2.    Yang, W. H.;Jiang, B. C., Multi-scale entropy analysis for postural sway signals with attention influence for elderly and young subjects, The 3rd applied human factors and ergonomics (AHFE) international conference, July 17-20, Miami., 201007

3.    Yang, W. H.;Bernard C. Jiang,Automatic detection of atrial fibrillation using statistical rank order sequences and RR interval patterns in ECG signals,The 9th Asia Pacific Industrial Engineering & Management Systems Conference,200812

4.    Wang, C. C.;Bernard C. Jiang;Chang, C. D.,Analysis of hypertension and hyperlipidemia common cause using multi-feature selection method,The 38th International Conference on Computers and Industrial Engineering,200810

5.    Wang, C. C.;Bernard C. Jiang;Chou, Y. S.;Chu, C. C.,An Automatic Image Enhancement Technique for Low Contrast Image,The 9th Asia Pacific Industrial Engineering & Management Systems Conference,200808

6.    Wang, C. C.;Bernard C. Jiang;Lin, J. Y.;Chu, C. C.,A modified correlation coefficient based pattern matching for defect detection,The 38th International Conference on Computers and Industrial Engineering,200810

7.    Yang, W. H.;Bernard C. Jiang,Combining forward-backward RR interval detector with arrhythmic beat classification in ECG signals,The 38th International Conference on Computers and Industrial Engineering,200810

8.    Yang, W. H.;Bernard C. Jiang,Adaptive threshold technique based on statistical process control and wavelet transformation for detecting R peak in ECG signal,The proceedings of the 3rd Asian International Workshop on Advanced Reliability Modeling (AIWARM),200810

9.    Wang, C. C.;Chang, C. D.;Bernard C. Jiang,Construct the Predictive Model for Multi-Diseases Using Multivariate Adaptive Regression Splines Method,The 9th Asia Pacific Industrial Engineering & Management Systems Conferenc,200812

10.    何俊漢,王建智,江行全,建立以六標準差為架構之多參數與多品質最佳化研究─以DVD光碟片製程為例,第一屆工業工程與管理產學研發成果研討會,March,2007

11.    江行全;王建智;周月霞;朱建政,快速強化低對比電子產品檢測影像之研究,中國機械工程學會第24屆全國學術研討會

12.    Jiang, B. C., Wang, C. C., Chen, H. J. and Chu, C. C. (2006) "Automatic Bubble Defect Inspection for Microwave Communication Substrates Using Multi-threshold Technique Based Co-Occurrence Matrix," The 11th Annual International Conference on Industrial Engineering Theory, Applications and Practice, October 24-27, 2006, Nagoya, Japen

13.    江行全,王建智,林京佑,朱建政,發展以灰階差異為基礎之部分資訊相關係數法於電子產品表面瑕疵檢測,第六屆全國AOI論壇,October,2006

14.    Jen, C. H., Jiang, B. C., and Wang, C. C. (2006) "An improved control framework using robust regression estimation for changes in a dynamic model," The 11th Annual International Conference on Industrial Engineering Theory, Applications and Practice, October 24-27, 2006, Nagoya, Japen

15.    Jen, C. H.;Jiang, B. C;Wang, C. C.,An improved control framework using robust regression estimation for changes in a dynamic model,The 11th annual international conference on industrial engineering theory, applications and practice,October,2006

16.    Jen, C. H., Jiang, B. C., and Wang, C. C. (2006) "The process adjustment schemes choice for dealing with the process change in different dynamic models," The 36th International Conference on Computers and Industrial Engineering, June 20-23, 2006, Taiwan, R.O.C. (PSC Best Paper Award in the field Semiconductor Manufacturing)

17.    Jiang, B. C., Wang, C. C., Chen, H. J., and Chu, C. C. (2006) "Automatic Bubble Defect Inspection for Microwave Communication Substrates Using Multi-threshold Technique Based Co-Occurrence Matrix, "The 11th Annual International Conference on Industrial Engineering Theory, Applications and Practice

18.    Yang, W.H., and Jiang, C. C. (2006) "The Detection of the QRS Complex Based on Wavelet Transform Using the MIT/BIH Arrhythmia Database, "The 11th Annual International Conference on Industrial Engineering Theory, Applications and Practice

19.    Jiang, B. C;Wang, C. C.;Chen, H. J.;Chu, C. C.,Automatic bubble defect inspection for microwave communication substrates using multi-threshold technique based co-occurrence matrix,The 11th annual international conference on industrial engineering theory, applications and practice,October,2006

20.    Jiang, B. C., Wang, C. C. and Chu, C. C. (2005) "BGA surface defects inspection and classification using machine vision," 6th Asia Pacific Industrial Engineering and Management Society Conference and the 8th Asia Pacific Division Meeting of the International Foundation of Production & Research, Makati City, Manila, Philippines.

21.    Jiang, B. C., Wang, C. C. and Hsu, Y. N. (2005) "PCB Solder Joints Inspection With Background Remover Technique," International Conference of The 3rd ANQ Congress & The 19th Asia Quality Symposium, Taipei, Taiwan.

22.    王建智, 江行全, 陳菁華 (2005) "建立瓦楞紙板動態緩衝曲線於衝擊吸收特性之研究," 中國工業工程學會九十四年會暨學術研討會, 中華大學, 新竹.

23.    江行全, 王建智, 潘旭純, 朱建政 (2005) "應用機器視覺於TAB表面線路瑕疵檢測之研究," 中國工業工程學會九十四年會暨學術研討會, 中華大學, 新竹.

24.    江行全, 王建智, 朱建政 (2005) "應用機器視覺於工業品質檢測之研究," 第五屆全國AOI論壇, 交通大學, 新竹, 台灣.

25.    Jen, C. H. and Jiang, B. C. (2005) "An improved gramework of quality control using a novel combining method for the dynamic process," International Conference of the 6th Asia-Pacific Conference on Industrial Engineering and Management Systems, December 5-7, 2005, Philippine.

26.      Jiang, B. C, Wang, C. C, Tasi, D. M and Lu, C. J (2004), “LCD Surface  Defects  Inspection Using Machine Vision," International Conference of the Fifth Asia-Pacific Conference on Industrial Engineering and Management Systems, December 12-15, 2004, Australia

27.    江行全, 王建智, 曾紀鋼, 朱建政 (2004) "彩色視覺系統於晶圓表面瑕疵檢測之研究," 中國工業工程學會九十三年度年會暨學術研討會, 成功大學, 台南.

28.    江行全, 王建智, 張瑜珊 (2004) "建構動態AQL抽樣計劃-以IC測試廠為例," 中華民國品質學會40屆年會暨第10屆全國品質管理研討會, 國立高雄大學, 高雄.

29.    Jiang, B. C, Wang, C. C and Huang, W. H (2003) "Evaluation of the Effectiveness of Using Digital Cameras for Inspection," International Ergonomics Conference, May 7th - 9th, Munich.

30.    Jiang, B. C., Wang, C. C and Liu, H. C (2003) "LCD surface uniformity defect inspection study," The 8th Annual International Conference Industrial Engineering – Theory, Application and Practices, Las Vegas, Nevada.

31.    王建智, 江行全 (2003) "非常態多維資料之貝氏分類的探討 – 以銲錫瑕疵辨識為例," 中國工業工程學會九十二年度年會暨學術研討會, 建國技術學院, 彰化.

32.    王建智, 江行全, 劉志偉 (2003) "印刷電路板組抗模式之研究 – 以八層板為例," 中華民國品質學會39屆年會暨第9屆全國品質管理研討會, 中原大學, 中壢.

33.    江行全, 吳銘益, 任志宏, 王建智 (2003) "應用模糊類神經網路於批次製程控制之研究," 中國工業工程學會92年度年會暨學術研討會, 建國技術學院, 彰化.

34.    Wang, C. C and Jiang, B. C (2002), "The Strategy of Non-Normal Feature Variables  for Defects Classification," International Conference of the Fourth Asia-Pacific Conference on Industrial Engineering and Management Systems, December 18-20, Taipei.

35.    Wang, C. C and Jiang, B. C (2002), "Feature Selection by Integral DOE and MANOVA Technique for Classification," International Conference of Industrial Engineering and Enterprise Management (IE&EM'2002), Tsinghua University, Beijing, P. R. China.

36.    Jiang, B. C and Wang, C. C (2002), "PCB Defects Inspection Using Machine Vision System," International Conference of Industrial Engineering and Enterprise Management (IE&EM'2002), Tsinghua University, Beijing, P. R. China.

37.    王建智、江行全, (2002), “DES中銅箔均勻度之製程參數設計與分析”, 第二屆台塑集團應用工程技術研討會, 台北縣, 明志技術學院.

38.    江行全、王建智、黃朝興, (2002), “具有自我相關之二維多變量管制圖之評估”, 中華民國品質學會38屆年會暨第8屆全國品質管理研討會, 台中。

39.    王建智, 江行全 (2001) "建構以重疊區域為基礎之特徵變數選取指標," 中國工業工程學會90年度年會, 高雄, 義守大學.

40.    江行全, 呂佳翰, 王建智 (2001) "建構多反應值最佳化區域之研究," 中華民國品質學會37屆年會暨第7屆全國品質管理研討會, 高雄, pp. 457-468.

41.    江行全, 李淑惠, 王建智 (2001) "動態X光影像即時強化分析," 中華民國第4屆可靠度與維護度技術研討會, 台北, pp. 133-142.

42.    江行全, 范書愷, 任志宏, 王建智 (2001) "多變量自適應控制應用於半導體R2R控制," 中國工業工程學會90年度年會, 高雄, 義守大學.

43.    Jiang, B. C, Wang, Y. M and Wang, C. C (2000) "Bootstrap Sampling Techniques Applied to PCB Golden Fingers Defect Classification," The Third Pacific Conference Industrial Engineering and Management Systems, Hong Kong.

44.    Wang, C. C., Bernard, C. Jiang and Y. H. Hsu (2000) "PCB Solder Joints Defects Detection and Classification Using Machine," The 5th Annual International Conference Industrial Engineering – Theory, Application and Practices, National Tsing Hsu University, Taiwan, R. O. C.

45.    王建智, 江行全, 許友南 (2000) "機器視覺為基之銲錫瑕疵檢測與分類," 第九屆南區統計研討會, 成功大學, 台南.

46.    江行全, 俞佳伶, 王建智 (2000) "印刷電路板製程中完稿底片尺寸漲縮變異之評估," 中華民國品質學會三十六屆年會暨第六屆全國品質管理研討會第十四屆亞洲品質研討會, 台北.

47.    李思賢, 王建智, 江行全 (2000) "鋁輪圈壓鑄機製程最佳化之研究," 第四屆中亞品質工程研討會, 台北科技大學, 台北.

48.    江行全, 陳佩玲, 王建智 (1999) "邏輯迴歸樹應用於PCB金手指之瑕疵分類," 中國工業工程學會八十八年度年會暨第七屆國科會工業工程學門專題研究計畫成果研討會, 清華大學, 新竹.

49.    Chi-Hsing Hsu, B. C. Jiang and E. S. Lee (1999) “Neuro-Fuzzy Ranking for New Product Development,” Proceedings of the Eighth International Fuzzy Systems Association World Congress, Vol. 1, pp. 166-170, August 17-20, Taipei, Taiwan.

50.    Jiang, B. C., and C. H. Hsu (1999) “FMADM Using a Simplified Centroid-based Arithmetic Process for an Integrated Manufacturability Management Model,” Proceedings of the International Conference on Management of Engineering and Technology, Vol. II, Session 19, pp. 1-7, Portland, OR, USA.

51.    王建智、江行全 (1999)「貝氏方法在機器視覺檢測分類中之應用」,中華民國品質學會第三十四屆年會暨第四屆全國品質管理研討會論文集,中壢,台灣,1998年9月。

52.    陳怡和、江行全,「供應商管理標竿之建立與分析- 以台灣筆記型電腦產業為例」,中華民國品質學會第三十四屆年會暨第四屆全國品質管理研討會論文集,中壢,台灣,1998年9月。

53.    Hsu, C. H. and Jiang, B. C., “Estimating Reliability for a Missile Weapon System by Fuzzy Sets and Neural Network,” Proceeding of the 2nd R.O.C. Symp. on R. & M., Chung-Li, Taiwan, pp. 331-317, May 1997. (NSC86-2623-D-155-005)

54.    許績興、江行全,「模糊邏輯決策應用於同步工程產品開發的研究」,第五屆國防管理學術暨實務研討會論文集,pp. 557-567,台北,中華民國八十六年三月。(NSC86-223-D155-005)

55.    江行全、許績興、鄭元杰、王台平、吳社邦,「以作業為基成本方法與模糊多準則決策模式評估工件易製性」,中國工業工程學會八十六年度年會論文集,第一冊,pp. 1-6,高雄,中華民國八十六年十二月。(NSC86-2623-D-155-005)

56.    Shiau, Y. R., Jiang, B. C., and C. M. Wu, “A Heuristic Algorithm and the Measurement Loss for Line Segment Measurement Using MVS,” The 4th International Conference on Automation Technology Proceedings, pp. 583-589, Hsinchu, Taiwan, July 8-11, 1996.

57.    Jiang, B. C. and Jiang, S. J., “Automatic Inspection of Oil Seals,” Proceedings of the Japan-USA Symposium on Flexible Automation, Boston, Massachusetts, USA, pp. 967-970, July 1996 (NSC-84-2212-E-155-018).

58.    Chiu, S. D. and Jiang, B. C., “Feature-based Measurement Points Determination with CMM,” Proceedings of the 4th International Conference on Automation Technology, Hsinchu, Taiwan, ROC, July 1996.

59.    許績興、江行全,「以作業為基的成本制度支援同步工程環境的研究」,第四屆國防管理學術暨實務研討會論文集,台北,pp. 1259-1268,中華民國85年3月。

60.    江新偵、江行全、蔡篤銘,「應用機器視覺檢驗油封表面瑕疵」,第八屆全國自動化科技研討會論文集(二),中壢,台灣,pp. 873-879, 中華民國84年7月。

61.    Wu, C. M., Shiau, Y. R., Jiang, B. C., “Regression Analysis for Calibrating the Machine Vision System,” 第九屆全國技術及職業教育研討會,工業類IV,台灣雲林,pp. 309-318, 1995.

62.    Shiau, Y. R. and Jiang, B. C., “Determining an Acceptable Resolution of a MVS by Inspection Quality Loss,” Proceedings of the Automation ’95. Chung-Li, Taiwan, ROC, pp. 244-251, July 1995.

63.    Chou, C. Y., Jiang, B. C., Shiau, Y. R., “Implementing the Automated Visual Inspection for Products’ Quality,” Proceedings of the Automation ’95, Chung-Li, Taiwan, ROC, pp. 849-856, July 1995.

64.    Wu, C. M., Jiang, B. C., and Shiau, Y. R., “A Neural-Networks Scheme for Robot Positioning Control,” Proceedings of the 1995 International IEEE/IAS Conference on Industrial Automation and Control, Emerging Technologies, Taipei, Taiwan, ROC, pp. 224-230, May 1995.

65.    Chen, H. Y., Wiens, G. J., and Jiang, B. C., “Correlution Between Knematic and Dynamic Robot Performace Measures,” Proceedings for the 1994 Japan-USA Symposium on Flexible Manufacturing, Vol. 2, Kobe, Japan, pp. 439-446, July 1994.

66.    Jiang, B. C., R. Duraisamy, G, Wiens, and T. Black, “Artifact Testing of a Robot Using Taguchi Methods,” Proceedings for the 1994 Japan-USA Symposium on Flexible Manufacturing, Vol. 2, Kobe, Japan, pp. 435-438, July 1994.

67.    Wu, C. M., Shiau, Y. R., and Jiang, B. C., “Neural Networks Approach for Robot Positioning Control,” CIIE National Conference Proceedings, Kaohsiung, Taiwan, pp. 348-353, Nov. 1992.

68.    Shiau, Y. R., Wu, C. M., and Jiang, B. C., “Taguchi Methods Applied on a Machine Vision System,” CIIE National Conference Proceedings, Kaohsiung, Taiwan, pp. 180-185, Nov. 1992.

69.    Wu, C. M., Jiang, B. C., and Shiau, Y. R., “MTL-CPN Control for Robot Positioning,” Proceedings of the Second International Conference on Automation Technology, Taipei, Taiwan, Vol. 3, pp. 15-22, July 1992.

70.    Wu, C. M., Jiang, B. C. and C. H. Wu, “Using Neural Networks for Robot Positioning Control,” Intelligent Engineering Systems through Artificial Neural Networks, Proceedings of the Artificial Neural Networks in Engineering (ANNIE ’91) Conference, Edited by C. H. Dagli, S. R. T. Kumara, and Y. C. Shin, St. Louis, MO, pp. 795-800, November 10-13, 1991

71.    Jiang, B. C. and Otto S. H. Cheng, “Design of a Safe Robotic Cell,” Robots 14 Conference Proceedings, Detroit, MI, pp, 5-27 to 5-41, November 1990. Also as a SME Technical Paper MS90-684.

72.    Jiang, B. C. and Y. R. Shiau, “How Well a Low-Cost Machine Vision System Can Measure,” Vision ’90 Conference Proceedings, Detroit, MI, pp. 1-43 to 1-55, November 1990. Also as a SME Technical Paper MS90-567.

73.    Jiang, B. C. and JT. Black, “A Review of Robot Metrology,” Proceedings of the First International Conference on Automation Technology, Taipei, Taiwan, pp. 89-98, July 1990.

74.    Jiang, B. C. and JT. Black, “Taguchi Methods-Based Robot Process Capability,” Proceedings of the 1990 Japan-USA Symposium on Flexible Automation, Kyoto, Japan, pp. 1007-1010, July 1990

75.    Wu, C. M., JT. Black and Jiang, B. C., “Use Taguchi Methods to Determine and Optimize A Robot’s Process Capability for Commanded Path,” Proceedings of Manufacturing 90, Vol. IV, Atlanta, GA, pp. 187-192, March 1990.

76.    Chen, C. S., Jiang, B. C. and C. H. Wu, “Evaluation of Neural Networks Training Efficiency,” (Abstract Only) Presented at the First Workshop on Neural Networks, Auburn, AL, February 1990.

77.    Wu, C. M. and Jiang, B. C., “Controlling Robot Process Capability Using Neural Networks,” (Abstract Only) Presented at the First Workshop on Neural Networks, Auburn, AL, February 1990.

78.    Jiang, B. C. and JT. Black, “Summary Report on Robot Process Capability,” Proceedings of NSF Design and Manufacturing Systems Conference, Tempe, AZ, pp, 325-333, January 1990.

79.    Jiang, B. C., W. H. Chen, JT. Black and J. N. Hool, “Taguchi Methods-Based Robot Metrology,” Robots 13 Conference Proceedings, Gaithersburg, MD, pp. 1.45-1.59, May 1989, also as SME technical paper MS89-287.

80.    Jiang, B. C., “Experience in the Development of a Vision System for Manufacturing Education,” Robots 13 Conference Proceedings, Gaithersburg, MD, pp. 15.1-15.10, May 1989, also as SME technical paper MS89-323.

81.    Jiang, B. C., David W. H. Chen, JT. Black and J. N. Hool, “Determine/Optimize Robot Process Capability Using Taguchi Methods,” Proceedings of the NSF DMCE Manufacturing Grantees Conference, Berkeley, CA, pp. 21-30, January 1989.

82.    Jiang, B. C. and JT. Black, “Determination/Improvement of Robot Process Capability,” Proceedings of the 11th Triennial World Congress of the International Measurement Confederation (IMEKO)-Sensors, Houstonm, TX, pp. 355-365, October 1988.

83.    Jiang, B. C., JT. Black and R. Duraisamy, “A Critical Review of Gaging Robot Process Capability,” Proceedings of the Robots 12/Vision 88, Detroit, MI, pp. 10.1-10.11, June 1988, also as SME technical paper MS88-323.

84.    Jiang, B. C. and JT. Black, “Robot Process Capability Study,” Proceedings of the 14th Conference on Production Research and Technology, Ann Arbor, MI, pp. 205-212, October 1987 (NSF Grantees Conference).

85.    Jiang, B. C. and W. Chen, “Camera Calibration Technique Using Vanishing Point Concept,” Proceedings of the IEEE 1987 International Conference on System, Man and Cybernetics, Washington, D. C., pp. 640-644, October 20-23, 1987.

86.    Jiang, B. C., “A Systematic Procedure in Designing a Robotic Workplace,” Proceeding of the IXth ICPR, Cincinnati, OH, pp. 2707-2713, August 1987.

87.    Teng, S. H. and Jiang, B. C., “Application of Vision System in Manufacturing Parts Alignment,” Proceedings of the IXth ICPR, Cincinnati, OH, pp. 443-449, August 1987.

88.    Jiang, B. C., “Safety Considerations for Programming Industrial Robot,” Proceedings of the Annual International Industrial Ergonomics and Safety Conference, Miami, FL, pp. 465-472, June 1987.

89.    Gainer, A. C. and Jiang, B. C., “A Cause-and-Effect Analysis of Industrial Robot Accidents From Four Countries,” Robots 11 Conference Proceedings, Chicago, IL, pp. 9-1 to 9-11, April 1987.

90.    Jiang, B. C. and JT. Black, “Robot Process Capability – An Overview,” In the Proceedings of the IEEE 1986 International Conference on Systems, Man and Cybernetics, Atlanta, GA, pp. 319-323, October 1986.

91.    Calisto, G. W., Jiang, B. C. and S. H. Cheng, “A Checklist for Carpal Tunnel Syndrome,” In the Proceedings of the Human Factors Society 30th Annual Meeting, Dayton, OH, pp. 1438-1442, September 1986.

92.    Jiang, B. C., “Robot Safety – Users’ Guidelines,” Proceedings of the Annual International Industrial Ergonomics and Safety Conference, Louisville, KY, pp. 1041-1049, June 1986.

93.    Jiang, B. C., “A Systematic Procedure for Robot Safety,” In the Proceedings of the 25th Annual ASSE Professional Development Conference, New Orleans, pp. 245-255, June 1986 (Invited).

94.    Jiang, B. C., M. M. Ayoub, J. L. Smith, J. L. Selan and J. W. McDaniel, “Establishing a Physical Criterion for Assigning Personnel to U.S. Air Force Jobs,” In Proceedings of the Annual International Industrial Engineering Conference 1986, Dallas, TX, pp. 386-391, May 1986.

95.    Liou, Y. H., Jiang, B. C. and Smith, J. L., “Dynamic Biomechanical Model for Lifting Activities: A Microcomputer Application,” in the Proceedings of Human Factors Society 29th Annual Conference, Baltimore, MD, pp. 310-314, September 1985.

96.    Jiang, B. C. and Mital, A., “Job Design/Redesign Procedure for Manual Materials Handling Tasks,” In the Proceedings of Human Factors Society 29th Annual Conference, pp. 1002-1006, September 1985.

97.    Jiang, B. C. and J. L. Smith, “The Comparison of Stressfulness of Manual Materials Handling Activities,” Proceedings of 2nd Mid-Central Ergonomics/Human Factors Conference, Purdue University, pp. 577-589, June 1985.

98.    Jiang, B. C. and J. L. Smith, “Effective Strength Testing for Screening Manual Materials Handlers,” Abstract Only. The 1985 American Industrial Hygiene Conference, Las Vegas, NV, pp. 175-176, May 19-42, 1985.

99.    Ayoub, M. M., J. L. Selan and Jiang, B. C., “From Work Design to Employee Training: Issues in Manual Materials Handling,” In Proceedings of 1984 Annual International Industrial Engineering Conference, Chicago, pp. 159-263, May 1984.


C.    專書及專書論文
1.    Jiang, B. C., “3-D Measurement,” The Industrial Electronics Handbook, ed. J. David Irwin, Published by CRC Press, 1997, pp. 174-183.

2.    Jiang, B. C. and JT. Black, “A Review of Determining/Optimizing a Robot’s Process Capability,” Presented at the 3rd International Conference on CAD/CAM Robotics & Factories of the Future, Southfield, MI, August 1988, In CAD/CAM Robotics and Factories of the Future, Vol. III: Robotics and Plant Automation, pp. 21-26.

3.    Ayoub, M. M., J. L. Selan and Jiang, B. C., “Design for Health and Safety: Manual Material Handling,” Handbook of Human Factors, Ed. G. Salvendy, Published by John Wiley & Sons, pp. 790-818, 1987.

4.    Jiang, B. C. and J. L. Smith, “Fuzzy Modeling of Combined Manual Materials Handling Capacities,” Applications of Fuzzy Set Theory in Human Factors, Eds. W. Karwowski and A. Mital, published by Elsvier Science Publishers, pp.349-360, 1986.

5.    Ayoub, M. M., H. J. MacKenzie, S. Deivanayagam, J. E. Fernandez, J. L. Smith, W. Y. Masten, J. L. Selan, Jiang, B. C., “Training Manual in Occupational Ergonomics,” Institute for Ergonomics Research, Texas Tech University, Lubbock, TX, 1985.

6.    Ayoub, M. M., Selan, J. L. and Jiang, B. C., “A Mini-Guide for Manual Materials Handling Tasks,” Workshop Handout, International Conference on Occupational Ergonomics, Toronto, Canada, May 1984.

7.    Ayoub, M. M., Gidcumb, C. F., Hafez, H., Intaranont, K., Jiang, B. C. and Selan, J. L., “A Design Guilde for Manual Lifting,” A Draft Report Submitted to OSHA, August 1983.


D.    獎項
1.    江行全,第三屆有庠元智講座,財團法人徐有庠先生紀念基金會,2007/7

2.    江行全,93國科會研究傑出獎 (93-95),國科會,2006/8


E.    專利
1.    江行全,工程類,自動沿邊雷射切割紡織品方法,所有權-皓上企業有限公司,核准單位-中華民國,證書編號-發明第 I 279278 號,2007/4


F.    技術報告
1.    江行全(2005) 「發展以標準特徵子集為基礎之系統化瑕疵檢測與分類的研究(I)」期末報告,NSC94-2213-E-155-030

2.    江行全(2005) 「建立居家環境下高齡者心臟病復發預警評估系統--總計畫(II)」期末報告,NSC94-2213-E-155-011

3.    江行全(2005) 「建立居家環境下高齡者心臟病復發預警評估系統--子計畫七:高齡心臟病患復發關鍵因子之探討(II)」期末報告,NSC94-2213-E-155-014

4.    江行全(2004) 「整合機器視覺檢測與多變量即時監控系統於PCB製程之研究(III)」期末報告,NSC93-2213-E-155-005

5.    江行全(2004) 「建立居家環境下高齡者心臟病復發預警評估系統--總計畫(I)」期末報告,NSC93-2213-E-155-050

6.    江行全(2004) 「建立居家環境下高齡者心臟病復發預警評估系統--子計畫七:高齡心臟病患復發關鍵因子之探討(I)」期末報告,NSC93-2213-E-155-054

7.    江行全(2003)「自動化表面瑕疪分類與回饋控制系統之研究(III)」期末報告,NSC92-2213-E155-022.

8.    江行全(2003) 「整合機器視覺檢測與多變量即時監控系統於PCB製程之研究(II)」期末報告,NSC92-2213-E155-006.

9.    陳啟光,江行全,張百棧 (2002) 「工業工程教育課程改革與創新能力培養之研究(III)」期末報告,NSC91-2522-S155-001.

10.    江行全(2002) 「整合機器視覺檢測與多變量即時監控系統於PCB製程之研究(I)」期末報告,NSC91-2213-E155-047.

11.    江行全(2002) 「自動化表面瑕疪分類與回饋控制系統之研究(II)」期末報告,NSC91-2213-E155-034.

12.    徐業良,江行全,林志麟,黃依賢,詹前隆,謝建興,范守仁,江右君 (2002) 「建立高齡者生活品質之智慧型維護系統---總計畫(II)」期末報告,NSC91-2213-E155-027.

13.    江行全,王建智 (2002) 「應用機器視覺於覆晶封裝製程表面瑕疵偵測系統之開發」期末報告,NSC91-2622-E155-003-CC3.

14.    江行全 (2001)「自動化表面瑕疪分類與回饋控制系統之研究(I)」期末報告,NSC90-2218-E155-017.

15.    江行全 (2001)「印刷電路板製程規劃與品質監控系統之研究---子計畫三:印刷電路板瑕疪分類與分析(III)」期末報告,NSC90-2218-E155-016.

16.      江行全,蔡篤銘,鄭春生,孫天龍,鄭元杰 (2001) 「印刷電路板製程規劃與品質監控系統之研究---總計畫(III)」期末報告,NSC90-2218-E155-013.

17.    王建智,江行全 (2001) 「視覺檢測系統中選取最適特徵變數之研究(I)」期末報告,NSC90-2218-E131-012.

18.    陳啟光,江行全,張百棧 (2001) 「工業工程教育課程改革與創新能力培養之研究(II)」期末報告,NSC90-2511-S155-001.

19.    徐業良,江行全,林志麟,黃依賢,詹前隆,謝建興,范守仁,江右君 (2001) 「建立高齡者生活品質之智慧型維護系統---總計畫(I)」期末報告,NSC90-2218-E155-023.

20.    江行全 (2000)「工業工程學門赴歐日考察計畫」期末報告,NSC89-2217-E155-002.

21.    江行全 (2000) 「同步工程環境中產品開發決策模式之建立(2/2)」期末報告,NSC89-2213-E155-072.

22.      江行全 (2000)「印刷電路板製程規劃與品質監控系統之研究---子計畫三:印刷電路板瑕疪分類與分析(II)」期末報告,NSC89-2213-E155-073.

23.    江行全 (2000)「印刷電路板製程規劃與品質監控系統之研究---子計畫三:印刷電路板瑕疪分類與分析(II)」期末報告,NSC89-2213-E155-076.

24.    江行全 (1999) 「同步工程環境中產品開發決策模式之建立」期末報告,NSC89-2213-E155-015.

25.    江行全 (1999)「印刷電路板製程規劃與品質監控系統之研究---子計畫三:印刷電路板瑕疪分類與分析(I)」期末報告,NSC89-2213-E155-007.

26.    江行全 (1999)「印刷電路板製程規劃與品質監控系統之研究---子計畫三:印刷電路板瑕疪分類與分析(I)」期末報告,NSC89-2213-E155-004.

27.      江行全,唐麗英,許棟樑,楊錦洲,劉志明,黎正中,饒忻 (1999) 「台灣筆記型電腦全面品質管理標竿建立及分析(III)」期末報告,NSC89-2213-E007-017.

28.    江行全 (1999)「台灣筆記型電腦全面品質管理標竿建立及分析---子計畫III:台灣筆記型電腦全面品質管理標竿---供應商管理」期末報告,NSC88-2213-E155-012.

29.    江行全 (1999) 「柔性解算---基礎工具及實務應用之系統化研究---柔性解算應用於表面瑕疵之自動辨認與分類」期末報告,NSC88-2213-E155-010.

30.    許棟樑,江行全,唐麗英,楊錦洲,劉志明,黎正中,饒忻 (1999) 「台灣筆記型電腦全面品質管理標竿建立及分析(II)」期末報告,NSC88-2213-E007-010

31.      陳啟光,江行全,張百棧 (1999)「電腦網路安全監控系統」期末報告,NSC88-NSPO(A)-PC-FD10-01.

32.    江行全,「同步工程環境中產品開發決策模式之建立」,期末報告,NSC87-2213-E-155-024, 1998年7月。

33.    江行全,「台灣筆記型電腦全面品質標竿—供應商理」期末報告,NSC87-2213-E-155-016, 1998年7月。

34.    江行全、鄭元杰,「工程變更決策系統之研究」,期末報告,NSC87-2623-D-155-008, 1998年6月。

35.    江行全、鄭元杰,「智慧型易製性設計系統之研究」期末報告,NSC86-2623-D-155-005,1997年6月。

36.    江行全,「機器視覺系統中光源最佳化之研究」期末報告,NSC86-2213-E-155-002。

37.    江行全、蔡篤銘、蕭堯仁,「線上視覺品質檢測整合性研究--軟體模組及系統能力分析」期末報告,NSC85-2212-E155-009, 1996.

38.    江行全,「電腦整合設計/製程規劃/製造程序之並行工程子計畫四:物件導向特徵為基之群組編碼系統」期末報告,NSC84-2213-E-155-037, 1996

39.    江行全,「以校正評估非接觸式三次元量測」,工研院研究計畫CIT-83002期末報告,1995.

40.    江行全、蔡篤銘、蕭堯仁,「線上視覺品質檢測整合性研究,子計畫二:軟體模組及系統能力分析」期末報告,NSC84-2212-E155-018, 1995.

41.    江行全,「電腦整合設計/製程規劃/製造程序之並行工程,子計畫四:物件導向特徵為基之群組編碼系統」期末報告,NSC84-2221-E-155-005, 1995.

42.    江行全,「流程改造」,品質管制月刊,第31卷第5期,pp. 27-29, 1995.

43.    葉若春、王銘宗、楊烽正、江行全、鄭元杰,「電腦整合設計/製程規劃/製造程序之並行工程」重點研究群計畫期中報告,NSC82-0416-E-155-002, NSC82-0416-E-155-001, 1994.

44.    江行全,「ISO經驗談」,品質管制月刊,第30卷第1期,pp. 47-50, 1994.

45.    “Book Review – Instrumentation for Engineering Measurement, 2nd Ed., by Dally, Riley, and McConnel,” 1993 Applied Mechanics Reviews, Vol. 46, No. 6, pp. B84, 1993.

46.    Jiang, B. C., “Book Review - Instrumentation for Engineering Measurement, 2ed Ed., by Dally, Riley, and McConnel,” 1993 Applied Mechanics Reviews, Vol. 46, No. 6, pp. B84, 1993.

47.    Jiang, B. C., 1992, “Design and Test a Telemetric Data Acquisition and Analysis System for Pocket Surf,” Final Report to NIST, USA, for Grant No. 60NANB1D1109.

48.    Jiang, B. C., “Design Systematic Engineering Control for Robotic System Safety,” Final Report to NIOSH, USA, for Grant No. 1 R01 0H02230-01A1 and 1 R01 0H02230-02, 1990.

49.    “Book Review – Principles of Measurement Systems, by John P. Bentley,” Applied Mechanics, Vol. 42, No. 9, p. B155, September 1989.