The research results of Tseng, Yuan-Jye Professor are follows :
 

A.    Journal Papers
1.    Tseng Y.-J.;Ching-Yen Chen, A Design for Customer Preferences Model by Cluster Analysis of Geometric Features and Customer Preferences, International Journal Industrial and Manufacturing Engineering, Vol.12, No.7, pp925~929(2018/07)

2.    Tseng Y.-J.;Ching-Yen Chen, A Design for Customer Preferences Model by Cluster Analysis of Geometric Features and Customer Preferences, International Journal Industrial and Manufacturing Engineering, Vol. 12,No. 7, pp925~929(2018/07)

3.    Tseng Y.-J.;Chen, Yi-Shiuan,A Sustainable Design Model by Integrated Evaluation of Closed-loop Design and Supply Chain Using a Mathematical Model,International Journal of Mechanical, Aerospace, Industrial and Mechatronics Engineering, Vol. 10 , No. 7, pp 1208~1213 ( 2016/07 )

4.    Tseng Y.-J.;Yu, Fang-Yu;Huang, Feng-Yi, A Green Assembly Sequence Planning Model with a Closed-Loop Assembly and Disassembly Sequence Planning Using a Particle Swarm Optimization MethodInternational Journal of Advanced Manufacturing Technology, 57, pp. 11(2011)

5.    Tseng, Yuan-Jye,Jian-Yu Chen;Feng-Yi Huan, A multi-plant assembly sequence planning model with integrated assembly sequence planning and plant assignment using GA, International Journal of Advanced Manufacturing Technology, Volume 48, Numbers 1-4,pp. 333-345., 201004

6.    Tseng, Yuan-Jye,Jian-Yu Chen;Feng-Yi Huang, A particle swarm optimization algorithm for multi-plant assembly sequence planning with integrated assembly sequence planning and plant assignment, International Journal of Production Research, Vol. 48, No. 10,,pp. 2765–279

7.    Yuan-Jye Tseng;Hsiao-Ting Kao;Feng-Yi Huang, Integrated assembly and disassembly sequence planning using a GA approachInternational Journal of Production Research, 48, pp. 5991~6013, 201010

8.    Tseng, Yuan-Jye, and Feng-Yi Huang, “A multi-plant tolerance allocation model for products manufactured in a multi-plant collaborative manufacturing environment,” International Journal of Production Research, Vol. 47, No. 3, February 2009, pp. 733-749. (SCI)

9.    Tseng, Yuan-Jye, Jian-Yu Chen, Feng-Yi Huang, “A Particle Swarm Optimization Algorithm for Multi-plant Assembly Sequence Planning with Integrated Assembly Sequence Planning and Plant Assignment,” International Journal of Production Research, Accepted, 2009. (SCI)

10.    Yuan-Jye Tseng;Jian-Yu Chen;Feng-Yi Huang,A decision support system for multi-plant assembly sequence planning using a PSO approach,Proceedings of The 11th International Conference on Enterprise Information Systems (ICEIS 2009),ICEIS 2009, pp. 124-131,200905

11.    Huang, Feng-Yi, and Tseng, Yuan-Jye, “A multi-plant tolerance allocation model for assembled electronic products,” 2008 International Conference on Industrial Engineering and Engineering Management IEEM 2008 , Singapore, December 8-11, 2008. (EI)

12.    Tseng, Yuan-Jye, Hsiao-Ting Kao, and Feng-Yi Huang, “Integrated assembly and disassembly sequence planning using a GA approach,” International Journal of Production Research, 2009. (SCI)

13.    Shih, Chen-Lin, Tseng, Yuan-Jye , "Integrated multi-plants and supply chain system with minimizing total cost in collaboration manufacturing environments," Journal of Information & Optimization Sciences,Vol. 29, No. 5,May 2008, pp. 401-405. (EI)

14.    Tseng, Yuan-Jye, Hsiao-Ting Kao,and Feng-Yi Huang, "A decision support system for integrated assembly and disassembly planning using a GA approach," Proceedings of the International Conference on Enterprise Information Systems (ICEIS 2008),2008, pp. 348 -355. (EI)

15.    Tseng, Yuan-Jye, Yu-Wen Kao, and Feng-Yi Huang, “A model for evaluating a design change and the distributed manufacturing operations in a collaborative manufacturing environment,” Computers In Industry, Vol. 59, Issue 8, October 2008, pp. 798-807. (SCI)

16.    Tseng, Yuan-Jye, Wan-Ping Li, and Yu-Hua Lin, “Evaluation of design change alternative cases using an AHP approach to evaluate component relationships of a product,” Journal of the Chinese Institute of Industrial Engineers, Vol. 25, No. 5, September 2008. (EI)

17.    Yuan-Jye Tseng;Wan-Ping Li;Yu-Hua Lin,Evaluation of design change alternative cases using an AHP approach to evaluate component relationships of a product,Journal of Chinese Institute of Industrial Engineers (EI),Vol. 25, No. 5, pp. 358-367,200809

18.    Shih, Chen-Lin, and Tseng, Yuan-Jye, “Optimization of multi-plants design strategies with fuzzy reliability model in collaboration manufacture,” Journal of Information & Optimization Sciences, Vol. 29, No. 5, September 2008, pp. 808-812. (EI)

19.    Feng-Yi Huang;Yuan-Jye Tseng,A multi-plant tolerance allocation model for assembled electronic products,Proceedings of The 2008 International Conference on Industrial Engineering and Engineering Management (IEEM 2008),IEEM 2008, pp. 1194-1198,,200812

20.    Tseng, Yuan-Jye, and Chen-Lin Shih, “Optimization of multi-plants and SCM strategies with Lagrangian relaxation model,” Journal of Information & Optimization Sciences, Vol. 29, No. 5, September 2008, pp. 805-808. (EI)

21.    Tseng, Yuan-Jye, Jia-Fong Jhang, Feng-Yi Huang,"Multi-plant assembly panning Models for a collaborative manufacturing environment,"International Journal of Production Research,Vol. 45, No. 15, August 2007, pp. 3333–3349. (SCI)

22.    Lee, Der-Horng,Dong, Meng, Wen Bian, Tseng,Yuan-Jye, "Design of Product Recovery Networks Under Uncertainty," Journal of Transportation Research Board (Transportation Research Record),Vol. 2008, December 26, 2007, pp. 19-25. (SCI)

23.    Tseng, Yuan-Jye, Lin, Chi-Hung;Lin, Yu-Hua, "Integrated assembly and machining planning for electronic products using a genetic algorithm approach," International Journal of Advanced Manufacturing Technology, Published online 17 November 2006, Vol. 30, No.1-2, February 2008, pp. 140-155. (SCI)

24.    Tseng, Yuan-Jye, Tzeng, Huei-Ling, and Lin, Yu-Hua, “Collaborative design model planning with a design module formation and design task assignment model,” Journal of the Chinese Institute of Industrial Engineers, Vol. 22, No. 4, July 2005, pp. 309-317. (EI)

25.    Tseng, Yuan-Jye, and Lin, Yu-Hua, “ A model for supplier selection and tasks assignment,” The Journal of American Academy of Business, Vol. 6, No. 2, March, 2005, pp. 197-207. (ABI/INFORM ProQuest)

26.    Tseng, Yuan-Jye, and Lin, Yu-Hua, “The grey relational evaluation of the manufacturing value chain” The Journal of American Academy of Business, Vol. 7, No. 1, September, 2005, pp. 67-71. (ABI/INFORM ProQuest)

27.    Tseng, Yuan-Jye, Chen, Y.-D. and Liu, C.-C., “NC machining of freeform curves using biarc approximation,” International Journal of Advanced Manufacturing Technology, Vol. 17, No. 11, June 2001, pp. 783-790. (SCI) (NSC87-2213-E-155-023)

28.    Tseng, Yuan-Jye, and Liu, Chia-Cheng. “Concurrent analysis of machining sequences and fixturing setups for minimizing setup changes for machining mill-turn parts,” International Journal of Production Research, Vol. 39, No. 18, December 2001, pp. 4197-4214. (SCI) (NSC87-2213-E-155-026)

29.    Liu, Chia-Cheng, and Yuan-Jye Tseng,“Fixturing Analyses for Machining Mill/Turn Compound Parts,” Journal of the Chinese Institute of Industrial Engineers, Vol. 17, No. 3, May 2000, pp 331-340. (EI)

30.    Tseng, Yuan-Jye, and Chen, Yii-Der, “Three dimensional biarc approximation of freeform surfaces for machining tool path generation,” International Journal of Production Research, Vol. 38, No. 4, March 2000, pp. 739-763. (SCI) (NSC87-2213-E-155-023)

31.    Tseng, Yuan-Jye, and Jiang, B. C., “Evaluation of multiple feature-based machining methods using an activity-based cost analysis model,” International Journal of Advanced Manufacturing Technology, Vol. 16, No. 9, September 2000, pp. 617-623. (SCI) (NSC87-2623-D-155-008)

32.    Tseng, Yuan-Jye, and Liou, Li-Cheng, “Integrating assembly and machining sequences using graph-based representation models,” International Journal of Production Research, Vol. 38, No. 12, August 2000, pp. 2619-2642. (SCI) (NSC87-2213-E-155-026)

33.    Tseng, Yuan-Jye, and Sue, Yih-Ren, “Machining of free-form solids using an octree volume decomposition approach,” International Journal of Production Research, Vol. 37, No. 1, 1999, pp. 49-72. (SCI)

34.    Tseng, Yuan-Jye, and Terng, Yuang-Shyang, “Alternative tolerance allocations for machining parts represented with multiple sets of features,” International Journal of Production Research, Vol. 37, No. 7, 1999, pp. 1561-1579. (SCI) (NSC88-2213-E-155-014)

35.    Tseng, Yuan-Jye, “Fixturing design analysis for successive feature-based machining,” Computers In Industry, Vol. 38, No. 3, April 1999, pp. 249-262. (SCI)

36.    Tseng, Yuan-Jye, “A modular modeling approach by integrating feature recognition and feature-based design,” Computers In Industry, Vol. 39, No. 2, July 1999, pp. 113-125. (SCI)

37.    Tseng, Yuan-Jye, and Kung, Hong-Wei, “Evaluation of alternative tolerances for multiple machining sequences with geometric tolerances,” International Journal of Production Research, Vol. 37, No. 17, November 1999, pp. 3883-3900. (SCI) (NSC89-2213-E-155-019)

38.    張百棧, 鄭元杰, 吳佳霖, “機械加工設備遠程維修診斷系統,” 機械工業 (Journal of the Mechatronic Industry), 201期, 12 月 1999, pp. 211-221.

39.    Tseng, Yuan-Jye, “Feature-based fixturing analysis for machining parts represented with multiple sets of features,” International Journal of Production Research, Vol. 36, No. 10, 1998, pp. 2743-2770. (SCI) (NSC86-2213-E-155-001)

40.    Tseng, Yuan-Jye, and Lin, Chwan-Cherng, “Analysis on multiple sets of feature-based tool paths for prismatic machining parts,” International Journal of Production Research, Vol. 36, No. 12, 1998, pp. 3491-3509. (SCI) (NSC83-0415-E-155-003 NSC84-2213-E-155-023)

41.    Tseng, Yuan-Jye, and Joshi, Sanjay B., “Recognition of interacting rotational and prismatic machining features from 3-D mill-turn parts,” International Journal of Production Research, Vol. 36, No. 11, 1998, pp. 3147-3165. (SCI)

42.    江行全,黃家弘,鄭元杰, 及王台平, “在網際網路上利用模糊決策模式建構易製性評估系統,” 科技管理學刊, Vol. 3, No. 2, December 1998, pp. 155-176. (NSC86-2623-D-155-005)

43.    Tseng, Yuan-Jye, and Joshi, Sanjay B., “Recognizing multiple interpretations in 2 1/2 D machining of pockets,” International Journal of Production Research, Vol. 32, No. 5, 1994, pp. 1063-1086. (SCI)

44.    Tseng, Yuan-Jye, and Joshi, Sanjay B., “Recognizing multiple interpretations of interacting machining features," Computer-Aided Design, Vol. 26, No. 9, 1994, pp. 667-688. (SCI)

45.    Tseng, Yuan-Jye, and Joshi, Sanjay B., “Determining feasible tool-approach directions for machining Bezier curves and surfaces,”      Computer-Aided Design, Vol. 23, No. 5, 1991, pp. 367-379. (SCI)


B.    Conference Papers
1.    Yuan-Jye Tseng;Yu Tin, Evaluation of product design efficiency by evaluating product information and market information with consumer feedback collected from the internet, 2023 7th International Conference on Computer, Software and Modeling ( 2023/07/21 )

2.    Yuan-Jye Tseng;Ching-Yen Chen;Wan-Tzu Wu, A Product Design Evaluation Model Using Data Envelopment Analysis Method with Product Data from Internet Web, 2019 3rd International Conference on Computer, Software and Modeling (ICCSM 2019), 2019/07/14

3.    Chieh Lee;Yuan-Jye Tseng, Does facebook advertisement works? The power of target focus commercial aids, The 20th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2019) ( 2019/12/02 )

4.    Chieh Lee;Yuan-Jye Tseng, Quantity has a quality of its own? The relation between the popularity of a University and its online post volume, The 20th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2019) ( 2019/12/02 )

5.    Tseng Y.-J.;Ching-Yen Chen, A Design for Customer Preferences Model by Cluster Analysis of Geometric Features and Customer Preferences, 20th International Conference on Computers and Industrial Engineering, Sweden(2018/07/12)

6.    Tseng Y.-J.;Ching-Yen Chen, A Design for Customer Preferences Model by Cluster Analysis of Geometric Features and Customer Preferences, 20th International Conference on Computers and Industrial Engineering, Sweden, 2018/07/12

7.    Yuan-Jye Tseng;Chieh Lee;Ching-Yen Chen;Wan-Tzu Wu, Product Design Suggestions by Evaluation of Geometric Features Using Internet Text Mining and DEA Modelss, The 7th Institute of Industrial and Systems Engineers Asian Conference (IISEAsia2018), 2018 Chinese Institute of Industrial Engineers Annual Conference (CIIE 2018), 2018/10/18

8.    Yuan-Jye Tseng;Chieh Lee;Ching-Yen Chen;Wan-Tzu Wu, Product Design with Evaluation of Customer Preferences Using Text Mining and TOPSIS Modelss, The 7th Institute of Industrial and Systems Engineers Asian Conference (IISEAsia2018), 2018 Chinese Institute of Industrial Engineers Annual Conference (CIIE 2018), 2018/10/18

9.    Chieh Lee;Tseng Y.-J.;Ching-Yen Chen, A product Design Suggestions by Evaluation of Geometric Features Using Internet Text Mining and DEA Models, 49th Annual Meeting of the Decision Sciences Institute, USA, 2018/11/17

10.    Tseng Y.-J.;Li, Jia-Shu,A Design for Supply Chain Model by Integrated Evaluation of Design Value and Supply Chain Cost,19th International Conference on Industrial Engineering and Operations Management (ICIEOM 2017),France ( 2017/07/20 )

11.    Chieh Lee;Tseng Y.-J.;黃子恆;陳競妍, Customer Oriented innovations: how to integrate online customer reviews in new product development, Annual Meeting of Decision Science Institute, Taiwan(2017/11/18)

12.    Tseng Y.-J.;Yi-Shiuan Chen,A Sustainable Design Model by Integrated Evaluation of Closed-loop Design and Supply Chain Using a Mathematical Model,18th International Conference on Industrial Engineering and Operations Management (ICIEOM 2016),Venice, Italy ( 20160718 )

13.    Tseng Y.-J.;Chen, Yi-Shiuan;Wu, Wan-Tzu,Design for Supply Chain with a Closed-loop Design Evaluation Model Using a PSO Method,Asia Pacific Industrial Engineering and Management Systems Conference, ( 2016/12/07 )

14.    Tseng Y.-J.;Yi-Shiuan Chen,A Closed-loop Design Model for Sustainable Manufacturing by Integrating Forward Design and Reverse Design,17th International Conference on Industrial Engineering and Operations Management (ICIEOM 2015), ( 2015/07 )

15.    Tseng Y.-J.;Shin-Han Lin, Integrated Evaluation of Green Design and Green Manufacturing Processes Using a Mathematical Model, 2014 International Conference on Mechanical and Industrial Engineering (ICMIE 2014)(2014)

16.    Chen, Yi-Shiuan;Tseng Y.-J.;Chiou, Shin-Huei, A design for assembly and disassembly model using AHP and PSO methods, The Fourth POMS-HK International Conference Production and Operations Management Society-HK, Hong Kong, 3-4 January, 2013.(2013)

17.    Su, Li-Jong;Tseng Y.-J.;Chiou, Shin-Huei, An order assignment model for a closed-loop supply chain system with multi-plants, The Fourth POMS-HK International Conference Production and Operations Management Society-HK, Hong Kong, 3-4 January, 2013.(2013)

18.    Tseng Y.-J.;Wang, Yen-Jung, A Product Development for Green Logistics Model by Integrated Evaluation of Design and Manufacturing and Green Supply Chain, ICIME 2013 International Conference on Industrial and Mechanical Engineering, London, UK, July 08-09, (2013)

19.    Tseng Y.-J.;Su, Li-Jong;Chen, Yi-Shiuan;Liao, Yi-Ju, An Integrated BOM evaluation and Supplier Selection Model for a Design for Supply Chain System, 2013 Institute of Industrial Engineers Asian Conference, July 18-20, 2013, Taipei.(2013)

20.    Tseng Y.-J.;Wang, Yen-Jung;Chen, Chia-Chi;Huang, Feng-Yi, A design for supply chain model for supplier selection in a closed-loop supply chain using a mathematical model, The 7th International Congress on Logistics and SCM Systems (ICLS 2012)(2012)

21.    Tseng Y.-J.;Wang, Yen-Jung;Lee, Pei-Ju;Huang, Feng-Yi, Integrated evaluation of product design and forward supply chain and reverse supply chain using FANP, The 7th International Congress on Logistics and SCM Systems (ICLS 2012)(2012)

22.    Tseng Y.-J.;Yu, Fang-Yu;Huang, Feng-Yi, A Green Design for Assembly Model for Integrated Design Evaluation and Assembly and Disassembly Sequence Planning, International Conference on Green Economy Sustainable Development (ICGESD 2012)(2012)

23.    Tseng Y.-J.;Feng-Yi Huang, An integrated design evaluation and assembly sequence planning model using a particle swarm optimization approach, World Academy of Science Engineering and Technology, 201106

24.    Yuan-Jye Tseng;Jen-Chi Wang;Feng-Yi Huang, A particle swarm optimization and case-based reasoning model for sub-disassembly formation in the multi-plant disassembly sequence planning, The 17th International Conference on Concurrent Enterprising (ICE 2011)

25.    Tseng, Yuan-Jye,Huang, Feng-Yi;Hung, Tzu-Yin;Lin, Yu-Hu, A multi-plant assembly sequence planning model with assembly sequence planning and plant assignment using case-based reasoning and GA methods, The 10th Asia Pacific Industrial Engineering & Management Systems

26.    Tseng, Yuan-Jye,Su, Yu-Ju;Huang, Feng-Yi, Supplier Selection and Evaluation Models for a Design Change Scheme in Collaborative Manufacturing Environment, The 40th International Conference on Computers & Industrial Engineering (CIE40), 201007

27.    Tseng, Yuan-Jye,Yu, Fang-Yu;Huang, Feng-Yi, A green decision support system for integrated assembly and disassembly planning using a PSO approach, The 5 th International Conference on Software and Data Technologies ICSOFT 2010, ., 201007

28.    Yuan-Jye Tseng;Jen-Chi Wang;Feng-Yi Huang;Shin-Huei Chiou, A particle swarm optimization and case-based reasoning model for multi-plant assembly sequence planning, The 11th Asia Pacific Industrial Engineering & Management Systems Conference (APIEMS 2010)

29.    Yuan-Jye Tseng;廖怡如, 運用電腦動畫模擬製程-以太陽能板中後段部分製程為例, International Conference on Digital Content (ICDC 2010), 2010數位內容學術暨橋接成果研討會, 中央大學, 中壢市, 21-22 December, 2010., 201012

30.    Yuan-Jye Tseng;Yu-Ju Su;Feng-Yi Huang;Shin-Hang Lin, Evaluation of design alternative cases and the affected supplier selection in a collaborative manufacturing system, The 11th Asia Pacific Industrial Engineering & Management Systems Conference (APIEMS

31.    Tseng Y.-J.;Feng-Yi Huang, A Multi-plant Tolerance Allocation Model for Assembled Electronic Products in Green Supply Chain Management, International Conference on Industrial Engineering and Engineering Management, 201012

32.    Yuan-Jye Tseng;馬千琇, 運用Cinema 4D動畫模擬太陽能板中游前段製程, International Conference on Digital Content (ICDC 2010), 2010數位內容學術暨橋接成果研討會, 中央大學, 中壢市, 21-22 December, 2010., 201012

33.    Huang, Feng-Yi;Tseng, Yuan-Jye, Tolerance allocation using particle swam optimization for production planning in the collaborative manufacturing environment, The 10th Asia Pacific Industrial Engineering & Management Systems Conference (APIEMS 2009), pp. 2497-2506, 2

34.    Tseng, Yuan-Jye,Chen, Jian-yu;Huang, Feng-Yi, An integrated assembly sequence planning and plant assignment model for products assembled in a multi-plant system, The International Conference on Industrial Engineering and Engineering Management, IEEM 2009 (EI), ., 200

35.    Tseng, Yuan-Jye,Huang, Feng-Yi;Ku, Ting-Yu;Lin, Yu-Hua, A multi-plant and multi-stage capacity planning model for IC packaging processes, The 10th Asia Pacific Industrial Engineering & Management Systems Conference (APIEMS 2009), pp. 2517-2524, 200912

36.    鄭元杰, 陳建宇, 黃鳳儀, “應用粒子群演算法規劃多廠區組裝產品之組裝次序,” 中國工業工程學會97年度年會暨學術研討會, 中原大學, 中壢, December 13, 2008.

37.    Tseng, Yuan-Jye, Hsiao-Ting Kao, and Feng-Yi Huang, “A decision support system for integrated assembly and disassembly planning using a GA approach,” 10th International Conference on Enterprise Information Systems ICEIS 2008, Barcelona, Spain, June 12-16, 2008.

38.    王仁祺, 黃鳳儀, 鄭元杰, “運用3D動畫呈現產品製造過程-以IC封裝產業為例, ”Applying 3D animation to display the production process of a case study of ic packaging,“ 2008 International Conference on Digital Content ICDC’08, 元智大學, Chungli, Taiwan. December, 26, 2008.

39.    王仁祺, 黃鳳儀, 鄭元杰, “運用3D MAX動畫模擬產品製造過程-以IC封裝產業為例 Applying 3D studio MAX to simulate the production process: a case study of IC packaging,” 2008新媒體設計傳播與科技應用國際學術研討會, 2008 International Conference on Design, Communication, and Technology of New Media, 元智大學, 中壢市, 2008年6月27日, Chung-Li, Taiwan, June 27, 2008.

40.    Feng-Yi Huang;Yuan-Jye Tseng,A model for evaluating design changes by analyzing changed design assignment and affected manufacturing distribution,The 9th Asia Pacific Industrial Engineering & Management Systems Conference (APIEMS 2008),200812

41.    鄭元杰, 陳建宇, 林玉華, “跨廠區零件組裝次序規劃-應用基因演算法,” 中國工業工程學會97年度年會暨學術研討會, 中原大學, 中壢, December 13, 2008.

42.    Feng-Yi Huang;Yuan-Jye Tseng ;Yu-Hua Lin,A genetic algorithm for tolerance allocation in a multi-plant collaborative manufacturing environment,The 9th Asia Pacific Industrial Engineering & Management Systems Conference (APIEMS 2008),200812

43.    鄭元杰, 古庭諭, 黃鳳儀, “多廠區多階製程之產能規劃與訂單分配─以IC封裝測試產業為例,” 中國工業工程學會97年度年會暨學術研討會, 中原大學, 中壢, December 13, 2008.

44.    Huang, Feng-Yi, and Tseng, Yuan-Jye, “A multi-plant tolerance allocation model for assembled electronic products,” 2008 International Conference on Industrial Engineering and Engineering Management IEEM 2008 , Singapore, December 8-11, 2008.

45.    Tseng, Yuan-Jye, Jian-Yu Chen;Feng-Yi Huang,應用粒子群演算法規劃多廠區組裝產品之組裝次序,中國工業工程學會97年度年會暨學術研討會,200812

46.    Tseng, Yuan-Jye, Jian-Yu Chen;Yu-Hua Lin,跨廠區零件組裝次序規劃-應用基因演算法,中國工業工程學會97年度年會暨學術研討會,200812

47.    Huang, Feng-Yi, and Tseng, Yuan-Jye, “A genetic algorithm for tolerance allocation in a multi-plant collaborative manufacturing environment,” The 9th Asia Pacific Industrial Engineering & Management Systems Conference APIEMS 2008, Bali-Indonesia, December 3-5, 2008.

48.    Tseng, Yuan-Jye, Li, Wan-Ping, and Huang, Feng-Yi, “Integrated evaluation of design task assignment and manufacturing operation distribution in a multi-plant collaborative system,” International Conference on Business and Information BAI 2007, Tokyo, Japan July 11-13, 2007.

49.    Tseng, Yuan-Jye, Feng-Yi Huang, and Wan-Ping Li, “An integrated design and manufacturing distribution model with optimized design and manufacturing costs for a multi-plant collaborative system,” The Third International Congress on Logistics and SCM Systems, Kanagawa University, Yokohama Japan, August 28-30, 2007.

50.    Tseng, Yuan-Jye, Wan-Ping Li, and Yu-Hua Lin, “Evaluation and selection of design change alternative cases using an AHP approach to evaluate component relationships of a product,” The Eighth Asia-Pacific Conference on Industrial Engineering and Management Systems APIEMS ’2007, Kaohsiung, Taiwan, December 9-12, 2007.

51.    Tseng, Yuan-Jye, Hsiao-Ting Kao, and Feng-Yi Huang, “Integrating assembly and disassembly sequence planning by evaluating integrated assembly and disassembly costs,” The Eighth Asia-Pacific Conference on Industrial Engineering and Management Systems APIEMS 2007, Kaohsiung, Taiwan, December 9-12, 2007.

52.    Tseng, Yuan-Jye, Huei-Ling Tzeng, Yu-Hua Lin, “Design distribution and evaluation model for collaborative design chain,” The Fifth International Conference on Electronic Business, Hong Kong, December 5-9, 2005, pp. 457-459.

53.    Shih, Chen-Lin, and Yuan-Jye Tseng, “Evaluation of multination multi-plants collaboration manufacturing product performance measurement,” The 36th International Conference on Computers and Industrial Engineering, Taipei, Taiwan, June 20-23, 2006.

54.    Shih, Chen-Lin, and Yuan-Jye Tseng, “Integrated collaboration manufacture and multi-echelon supply system with minimizing total shortage in collaboration manufacturing environment,” The 36th International Conference on Computers and Industrial Engineering, Taipei, Taiwan, June 20-23, 2006.

55.    Tseng, Yuan-Jye, and Huei-Ling Tzeng, “A design task distribution and product evaluation model in a collaborative design chain,” The 2006 INFORMS International Conference, Hong Kong, June 25-28, 2006, pp. 103-103.

56.    黃鳳儀,;鄭元杰,跨廠製造中整合設計與製造階段之公差分配與廠區指派模式,中國工業工程學會95年度年會暨學術研討會, 東海大學, 台中, December 23, 2006.

57.    鄭元杰;李月娥;黃鳳儀,多廠區多階製程緊急訂單分配與評估模式,中國工業工程學會95年度年會暨學術研討會, 東海大學, 台中, December 23, 2006.

58.    鄭元杰;李婉萍;林玉華,協同設計下設計變更方案之分析評估模式,中國工業工程學會95年度年會暨學術研討會, 東海大學, 台中, December 23, 2006.

59.    Tseng, Yuan-Jye ;Yu-Wen Kao;Feng-Yi Huang,Manufacturing cost evaluation of design changes in a collaborative design and manufacturing system,The 11th Annual International Conference on Industrial Engineering, Theory, Applications and Practice, Nagoya, Japan, October 24-27, 2006.

60.    Feng-Yi Huang;Yuan-Jye Tseng,A multi-plant tolerance allocation model for products manufactured with multi-plant manufacturing processes,The 11th Annual International Conference on Industrial Engineering, Theory, Applications and Practice, Nagoya, Japan, October 24-27, 2006

61.    Tseng, Yuan-Jye, Feng-Yi Huang, Yu-Hua Lin,A multi-plant process planning model for products with multiple sets of machining features in a collaborative manufacturing system,The 7th Asian Pacific Industrial Engineering and Management Systems Conference, Bangkok, Thailand, 17-20 December 2006.

62.    黃鳳儀;鄭元杰,多廠區製造環境下之公差分配模式,第三屆台灣作業研究年會暨2006年作業研究理論與實務學術研討會, 元智大學, 中壢市, November 18, 2006.

63.    鄭元杰, 林玉華, “製造價值鏈績效評估模式”, 2005企業全球佈局策略研討會論文集, 僑光技術學院, 台中, April 22, 2005, pp. 47.

64.    鄭元杰 , 張文龍, 林玉華, ‘多廠區多階製程產能規劃模式’, 中國工業工程學會94年度年會暨學術研討會, 中華大學, 新竹, December 17, 2005.

65.    鄭元杰, 黃志昌, 林玉華, ‘設計變更對設備成本影響之分析評估模式’, 中國工業工程學會94年度年會暨學術研討會, 中華大學, 新竹, December 17, 2005.

66.    施呈霖, 鄭元杰, “多廠區協同製造之產品可靠度評估模式,” 中國工業工程學會94年度年會暨學術研討會, 中華大學, 新竹, December 17, 2005.

67.    林玉華, 鄭元杰, “產業資源價值整合模式,” ICIM 2005 16th International Conference of Information Management, 第16屆國際資訊管理研討會論文集, 輔仁大學, Taipei, May 28, 2005 , pp. 22.

68.    Tseng, Yuan-Jye, and Lin, Yu-Hua, “A collaborative value chain model for evaluating manufacturing processes of multi-suppliers,” The International Conference on Information Management and Business (IMB2005), Taipei, Taiwan, March 25-26, 2005, pp. 181-186.

69.    林玉華, 鄭元杰, “建構打破組織疆界的製造資源產生器之研究,“ ECDL 2005電子商務與數位生活研討會論文集, 台北大學, 台北, March 25-26, 2005, pp. 63.

70.    Tseng, Yuan-Jye, Huei-Ling Tzeng, Yu-Hua Lin, “Design distribution and evaluation model for collaborative design chain,” The Fifth International Conference on Electronic Business, Hong Kong, December 5-9, 2005, pp. 457-459.

71.    Tseng, Yuan-Jye, Jia-Fong Jhang, Feng-Yi Huang, “Multi-plant assembly planning model in collaborative manufacturing and commerce systems,” The Fifth International Conference on Electronic Business, Hong Kong, December 5-9, 2005, pp. 421-423

72.    鄭元杰, 黃鳳儀, ‘跨廠區製造之公差分配與廠區指派’, 中國工業工程學會94年度年會暨學術研討會, 中華大學, 新竹, December 17, 2005.

73.    施呈霖, 鄭元杰, “協同製造工廠在供應鏈體系供應廠下多階層供應系統評估,” 中國工業工程學會94年度年會暨學術研討會, 中華大學, 新竹, December 17, 2005.

74.    林玉華, 鄭元杰, ‘製造價值網路模式’, 中國工業工程學會94年度年會暨學術研討會, 中華大學, 新竹, December 17, 2005.

75.    鄭元杰, 蔡佳利, and 林玉華,"多廠協同製造中跨廠組裝與加工次序之整合規劃,"產業電子化運籌管理學術暨實務研討會, 2004年6月.

76.    鄭元杰, 陳建銘, 黃鳳儀, and 林玉華,"供應鏈中多廠協同製造之緊急訂單產能規劃,"產業電子化運籌管理學術暨實務研討會, 2004年6月.

77.    鄭元杰, 張家鳳, 黃鳳儀 , ‘跨廠組裝次序規畫與協同易組性設計分析之研究, 中國工業工程學會九十三年度年會暨學術研討會, 台南, 民國九十三年十二月十八日, December 18, 2004.

78.    鄭元杰, 曾慧玲, 林玉華, '協同設計中設計模組化與設計任務指派模式之研究', 中國工業工程學會九十三年度年會暨學術研討會, 台南, 民國九十三年十二月十八日, December 18, 2004.

79.    鄭元杰, 林進添, 張文龍, '跨廠區多階製程之整合產能與物料規畫模式', 中國工業工程學會九十三年度年會暨學術研討會, 台南, 民國九十三年十二月十八日, December 18, 2004.

80.    林玉華, 鄭元杰, “使用灰關聯模式評價製造價值鏈之研究”, 2004商務決策研討會論文集, 中州技術學院, 彰化, December 17, 2004, pp. 1.

81.    林玉華, 鄭元杰, “應用灰色理論在供應商的選擇”, 創新與管理學術研討會論文集, 實踐大學, 台北, November 26, 2004, pp. 140.

82.    鄭元杰, 周哲維, 林進添, “多廠區生產之整體物料規劃, 中國工業工程學會九十二年度年會暨學術研討會, 彰化, 民國九十二年十二月六日, December 6, 2003.

83.    鄭元杰, 高瑜雯, 林玉華, “協同設計下設計變更之運作架構與評估模式, 中國工業工程學會九十二年度年會暨學術研討會, 彰化, 民國九十二年十二月六日, December 6, 2003.

84.    鄭元杰, 張美滿, “多廠區跨廠產能規劃模式-在PCB廠之應用”, 2002 PCB 製造與管理技術研討會論文集, 中壢市, 民國91年6月22日, June 22, 2002.

85.    鄭元杰, 江俊霖, “電子產品組裝廠之跨廠組裝次序”, 2002 PCB 製造與管理技術研討會論文集, 中壢市, 民國91年6月22日, June 22, 2002.

86.    鄭元杰, 林詠欽, “PCB多廠製造執行系統資料整合模式之研究”, 2002 PCB 製造與管理技術研討會論文集, 中壢市, 民國91年6月22日, June 22, 2002.

87.    Tseng, Yuan-Jye, and Yong-Chin Lin, “Integrating Multiple Manufacturing Execution Systems in a Multi-plant Manufacturing Environment”, Proceedings of The Fourth Asia-Pacific Conference on Industrial Engineering and Management Systems APIEMS'2002, Dec. 18-

88.    Tseng, Yuan-Jye, Chun Lin Chiang, “Integrated Assembly Sequence Planning for Products Assembled in a Multi-plant Manufacturing Scheme,” Proceedings of The Fourth Asia-Pacific Conference on Industrial Engineering and Management Systems APIEMS'2002, Dec. 18

89.    Tseng, Yuan-Jye, and Mei-Man Jang, “A Coordinated Capacity Planning Model for Multi-Plant Manufacturing,” Proceedings of The Fourth Asia-Pacific Conference on Industrial Engineering and Management Systems APIEMS'2002, Dec. 18-20, Taipei, Taiwan, 2002.

90.    鄭元杰, 蔣承洋, “整合物料表與生產途程之多層印刷電路板整體物料規劃”, 2001 PCB 製造技術研討會論文集, 中壢市, 元智大學, June 23, 2001.

91.    鄭元杰, 高宏璋, “電腦輔助多層印刷電路板製造途程規劃”, 2001 PCB 製造技術研討會論文集, 中壢市, 元智大學, June 23, 2001.

92.    鄭元杰, 何晉凱, “多層印刷電路板廠之整合產能規劃”, 2001 PCB 製造技術研討會論文集, 中壢市, 元智大學, June 23, 2001.

93.    鄭元杰, 江宏達, “設計變更對製造成本影響之分析評估模式”, 中華民國工業工程學會90年度年會暨學術研討會論文集, 高雄,民國九十年十二月八   日, December 8, 2001

94.    鄭元杰, 曾昭翔, 江俊霖, “自動化規劃電子產品組裝次序—以方法間衡量技術分析評估”, 中華民國工業工程學會90年度年會暨學術研討會論文集, 高雄,民國九十年十二月八日, December 8, 2001.

95.    鄭元杰, 何晉凱, 張美滿, “多層印刷電路板製造之整合產能規劃”, 中華民國工業工程學會90年度年會暨學術研討會論文集, 高雄,民國九十年十二月八日, December 8, 2001.

96.    鄭元杰, 蔣承洋, 姚瑞婷, “整合物料表與生產途程之整體物料規劃--應用於多層印刷電路板製造”, 中國工業工程學會九十年度年會暨學術研討會, 高雄, 民國九十年十二月八日, December 8, 2001.

97.    鄭元杰, 吳佳霖,與郭建昌,“製程板排版規劃與製程成本之整合分析”, 2000 PCB 製造技術研討會論文集, 中壢市, 元智大學, June 24, 2000.

98.    Tseng, Yuan-Jye, and Liu, Chia-Cheng, “Concurrent analysis of machining sequences and fixturing setups for minimizing setup change for machining mill-turn parts,” Proceedings of The 5rth Annual International Conference on Industrial Engineering -Theory, Applications and Practice, December 13-15, 2000, Hsinchu, Taiwan.

99.    Tseng, Yuan-Jye, and Lin, Chi-Hung, “Planning and evaluation of integrated machining and assembly sequences using genetic algorithms,” Proceedings of The 5rth Annual International Conference on Industrial Engineering -Theory, Applications and Practice, December 13-15, 2000, Hsinchu, Taiwan.

100.    鄭元杰, 與郭建昌, “多層印刷電路板排板方式與製程成本之整合分析”, 中華民國工業工程學會88年年會論文集, 新竹市, 清華大學, December 18, 1999.

101.    劉家盛, 與鄭元杰, “車銑切削加工複合工件之夾持分析”, 中華民國工業工程學會88年年會論文集, 新竹市, 清華大學, December 18, 1999.

102.    鄭元杰, 鄭春生, 與黃亞斌, “品質機能展開要求品質間相關聯性對品質要素重要度之影響,” 中華民國品質學會第三十四屆年會八十七年年會論文集, 中壢市, September, 1998.

103.    鄭元杰, 滕永祥, 與龔弘偉, “多組切削加工程序之加工製造公差分配評估,” 中華民國品質學會第三十四屆年會八十七年年會論文集, 中壢市, September, 1998.

104.    劉家盛, 鄭元杰, 與陳以德, “雙弧逼近不規則曲面進行刀具路徑產生及切削,” 中華民國工業工程學會87年年會論文集, 彰化縣, 大葉大學, December 13, 1998.

105.    鄭元杰, 劉立晟, “組件中組裝與加工次序之整合分析與評估,” 中華民國工業工程學會87年年會論文集, 彰化縣, 大葉大學, December 13, 1998.

106.    蘇裕仁, 與鄭元杰, "使用八分樹分解演算法建構區域地理八分樹," 第五屆國防管理學術暨實務研討會, 國防管理學院, March 20, 1997.

107.    鄭元杰, 與陳以德, "使用雙弧逼近法規劃不規則曲面切削刀具路徑," 中華民國工業工程學會八十六年年會論文集, 高雄市, 中山大學, December 27, 1997.

108.    鄭元杰, 與滕永祥, "多組特徵工件切削之公差分配評估," 中華民國工業工程學會八十六年年會論文集, 高雄市, 中山大學, December 27, 1997.

109.    鄭元杰, 江行全, 黃家弘, 洪祖凱, 王台平, 與吳社邦, "智慧型易製性設計系統之研究," 中華民國工業工程學會八十六年年會論文集, 高雄市, 中山大學, December 27, 1997.

110.    鄭春生, 鄭元杰, 與陳俊式, "柔性解算應用於機器分群之研究," 中華民國工業工程學會八十六年年會論文集, 高雄市, 中山大學, December 27, 1997.

111.    江行全, 許績興, 鄭元杰, 王台平, 與吳社邦, "以作業為基成本方法與模糊多準則決策模式評估工件易製性," 中華民國工業工程學會八十六年年會論文集, 高雄市, 中山大學, December 27, 1997.

112.    蘇裕仁, 葉若春, 與鄭元杰, "階層式之電腦輔助製程規劃系統-以切削含有自由曲面為邊界之工件為例," 中華民國工業工程學會八十六年年會論文集, 高雄市, 中山大學, December 27, 1997.

113.    鄭元杰, 與林傳城, "特徵模式中多組特徵組表示之工件的夾具分析," 中華民國工業工程學會八十五年年會論文集, 台北市, December 15, 1996.

114.    鄭元杰, 與蘇裕仁, "含自由曲面之實體模型工件之體積切削規畫-使用八分樹演算法, " 中華民國工業工程學會八十五年年會論文集, 台北市, December 15, 1996.

115.    鄭元杰, 鄧本中, 鄭春生, 與胡黃德, "應用類神經網路及模糊理論法辨認交疊特徵," 中華民國工業工程學會八十五年年會論文集, 台北市, December 15, 1996.

116.    鄭元杰, 與謝宜村, "特徵為基設計中之體積分解與整體切削加工規劃," 第八屆全國自動化科技研討會, 中壢市, 中原大學, July 11-12, 1995.

117.    鄭元杰, 與吳美毅, "對含有斜面的方型工件之自動特徵辨認," 中華民國工業工程學會84年會論文集, 中壢市, 中原大學, December, 17, 1995.

118.    Tseng, Yuan-Jye, and Joshi, Sanjay B., "Multiple Interpretations of Interacting Machining Features," IIE Industrial Engineering Research Conference, Atlanta, GA, USA, May 18-19, 1994.

119.    Tseng, Yuan-Jye, and Joshi, Sanjay B., "Recognition of Multiple Interpretations of Interacting Machining Features," Fourth IFIP WG5.2 Workshop on Geometric Modeling in Computer-Aided Design, Rensselaeville, NY, USA, Sep 27-Oct 1, 1992.